Monday, April 18, 2011

Tyvek has been installed around the building The rostrum first level has been decked and the second level is under way
Tyvek

Storm drain on the west end of the building is being installed.
The storm drain is being tied into the existing drainage structure

Tuesday, April 12, 2011

The new folding partition trusses have been installed
The new storm drain is being installed on the west end of the building. connecting to the existing storm drain inlet box.

Friday, April 8, 2011

The back wall of the existing building is being taken down.
Elec. wiring and A/V conduits have been roughed into the rostrum.
Sections of the parking lot are taken up to tie into the existing drainage structures.

Tuesday, April 5, 2011

Majority of the wall sheathing has been installed and tarps have been placed to keep the rain out.