Brick has been installed on the building as well as the roof

Curbs have been poured new sidewalk has been poured and asphalt has been installed in the new parking area

South side of the building

Drywall is being installed. sprinkler system is underway as well as the duct work in the mezzanine. Door frames have been installed and insulated.

Elec work in the cultural hall continues, speakers, can lights, and surface mounted lights are being roughed in. Basketball support hangers are in place. Sprinkler heads are in.