Remaining exterior
continuous footings have been poured.



Rebar for the stem wall is being installed as well as the forms.


Plumbers have started taking up the floor to add a drain for the new family bathroom.

Rear wall of the
chapel and connecting walk have been taken out.

Silt fence was installed near
geronimo
No comments:
Post a Comment