Friday, February 25, 2011

Remaining exterior continuous footings have been poured.





Rebar for the stem wall is being installed as well as the forms.







Plumbers have started taking up the floor to add a drain for the new family bathroom.






Rear wall of the chapel and connecting walk have been taken out.






Silt fence was installed near geronimo